Bid Information

Current Bids

2024 Street Maintenance Project

Bid Ready Specifications


Sewer Manhole Rehabilitation Services

Sewer Manhole Rehabilitation IDQ RFQ

Drainage Structure Rehab & CCTV Inspection

Bid Ready Specifications

Public Safety Building Generator Replacement

Bid Ready Specifications
Bid Ready Plans
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
Bid Tabulation

Roundabout Design at the Intersection of Angeline Road E and Veterans Memorial Drive E

  Notice to Consultant/Request for Qualifications
Power Point Presentation to Council
Pierce County Regional Council Award Letter
Cost Estimate
Pedestrian/Bike Submittal
DBE Goal
STIP Amendment

Hearing Examiner

  Hearing Examiner RFP

Current City Projects

Current projects are categorized below by City Managed Projects (City pays for design and construction) and Developer Managed Projects (Developer pays for design and construction).

Check the Legal Notices & Press Releases page for notices and advertisements related to these and other projects.

City Managed Projects (Capital Improvement Projects-CIP)

Grainger Springs Pump Facility Project
  • This project will replace the existing aging water pump facility at the Grainger Springs spring wells site. The project will build a new pump building and new pumps.
  • This project was awarded to McClure and Sons Inc. on February 13, 2024.
  • Construction to begin late July 2024.


Lift Station #20 Rehabilitation Project
  • This project will provide restoration to the wet well at Lift station #20. The project will replace corroding equipment in the wet well, patch deteriorating concrete and provide a new epoxy coating to the concrete.
  • The project was awarded to McCann Construction on November 20, 2023.
  • This project is substantially complete as of May 2024.
Veteran's Memorial Dr E and Angeline Rd E Intersection

The City has received Federal funds to address options for the traffic-flow  issues at this intersection.

Developer Managed Projects

East Pierce Fire Department Center Project
  • This project is a commercial building currently under construction.
Peak 410 Development
  • This a commercial development project currently under construction.
  • This project will provide multiple commercial structures located at 22911 Hwy 410 E.
  • WSDOT Developer Agreement

Office Hours:
Monday - Thursday
9:00 - 4:00
Fridays
By Appointment Only

Contact:
Engineering

Location:

Public Services Center
21719 96th ST E
Buckley, WA 98321

Mailing:
City of Bonney Lake
Attn: Engineering
21719 96th ST E
Buckley, WA 98321

Phone: 253-447-4356

Fax: 253-862-1116